Government Decision Framework

Why Districts Choose circular toilet:
The Complete Decision Framework

A comprehensive guide for municipal decision-makers to evaluate circular toilet technology for public sanitation infrastructure. Visit the unit at Lumbini Park, Hyderabad.

Interactive Decision Wizard

Answer 5 questions to see if circular toilet is right for your district

Question 1 of 5

Is your district located in a Coastal Regulation Zone (CRZ)?

Government Policy Alignment

circular toilet meets or exceeds all major Indian sanitation policy requirements

Swachh Bharat Mission 2.0

✓✓ Exceeds
  • ✓ODF++ certification support
  • ✓Sustainable sanitation systems
  • ✓No manual scavenging
  • ✓Safe treatment and disposal
  • ✓Water conservation focus

Aspirational Toilets & ODF++ Criteria

✓✓ Exceeds
  • ✓Zero discharge to environment
  • ✓No fecal sludge generation
  • ✓Safe, hygienic user experience
  • ✓Minimal water consumption
  • ✓Preventive maintenance systems

CRZ Regulations (2019)

✓ Full Compliance
  • ✓Zero liquid discharge
  • ✓No sewage pipe infrastructure required
  • ✓Environmental clearance compatible
  • ✓Minimal ground disturbance
  • ✓Beach & coastal area compliant

Smart Cities Mission

✓ Full Compliance
  • ✓IoT-enabled monitoring
  • ✓Real-time data dashboards
  • ✓Predictive maintenance alerts
  • ✓Remote management capability
  • ✓Integration with city systems

National FSSM Policy

✓✓ Exceeds
  • ✓Safe containment
  • ✓Professional emptying (no manual)
  • ✓Proper treatment before disposal
  • ✓Resource recovery alignment
  • ✓Decentralized approach

Step-by-Step Procurement Guide

Complete roadmap from evaluation to deployment

1

Feasibility Assessment

1-2 weeks

Site survey and requirement analysis with ReFlow technical team

Required Documents:

  • Site location maps
  • Expected daily footfall estimates
  • Existing infrastructure details
  • Power/water availability data
2

Budget Approval & Funding

2-4 weeks

Identify funding sources and secure internal approvals

Required Documents:

  • Cost-benefit analysis report
  • Funding source identification
  • Budget justification note
  • Council/committee approval
3

Tender Preparation

1-2 weeks

Prepare tender documents with technical specifications

Required Documents:

  • Technical specifications (provided by ReFlow)
  • Evaluation criteria matrix
  • Terms and conditions
  • Pre-qualification requirements
4

Vendor Evaluation

2-3 weeks

Evaluate proposals based on technical and financial criteria

Required Documents:

  • Technical compliance checklist
  • Financial bid comparison
  • Reference verification
  • Site assessment and discharge rules
5

Contract Award & Deployment

4-8 weeks

Finalize contract and begin installation

Required Documents:

  • Purchase order
  • Delivery schedule
  • Installation plan
  • Maintenance SLA agreement

Request Procurement Resources

📄

Sample Tender Document

Ready-to-use tender specifications for on-site treatment systems

Request Document
📊

Budget Justification Template

For internal approvals and council presentations

Request Template
✅

Evaluation Criteria Matrix

Technical & financial scoring framework

Request Matrix
🏛️

Request Site Visit

Visit our operational units in Hyderabad

Schedule Site Visit

Funding Sources & Financial Models

Multiple pathways to fund your circular toilet deployment

Swachh Bharat Mission 2.0

Central government grants for sustainable sanitation infrastructure

Quantum:Up to 60% project cost
Eligibility:All urban local bodies
Process:Apply through state mission directorate with DPR

State Urban Development Funds

State-level infrastructure development grants

Quantum:Varies by state (20-40%)
Eligibility:Municipal corporations and municipalities
Process:Submit project proposal to state urban development department

Smart Cities Mission Funding

For cities under Smart Cities Mission

Quantum:Project-based funding
Eligibility:Designated smart cities
Process:Include in Area-Based Development proposals

CSR Partnerships

Corporate Social Responsibility funding from private companies

Quantum:100% funding possible
Eligibility:All government bodies
Process:Approach companies with CSR programs (ReFlow can facilitate)

PPP Models

Public-Private Partnership for installation and operation

Quantum:Zero upfront cost
Eligibility:All government bodies
Process:Revenue-sharing or fee-based operational model

15th Finance Commission Grants

Tied grants for water and sanitation

Quantum:Performance-based allocation
Eligibility:All urban local bodies
Process:Include in annual action plan submission

Need help with funding applications?

Our team can assist with DPR preparation, grant applications, and CSR partnerships

Get Funding Assistance

Common Objections & Responses

Evidence-based answers to concerns raised by decision-makers

⚠️

Cost is too high compared to traditional toilets

Response:

A circular toilet is meant for sites without a sewer. The cost comparison depends on the site, the container size, and how it is operated.

Evidence:

Ask for a site assessment.

⚠️

We already have sewage infrastructure

Response:

A circular toilet is for places a sewer does not reach, or where a sewer connection is impractical.

Evidence:

Each site is assessed before a unit is placed.

⚠️

Technology is unproven in India

Response:

A circular toilet treats water inside the container. A public unit is at Lumbini Park, Hyderabad, inaugurated by Telangana ministers in September 2026.

Evidence:

The public unit is at Lumbini Park, Hyderabad.

⚠️

Maintenance will be complex

Response:

Operators can see status and alerts for the installed unit. Service is still done by the team on the ground.

Evidence:

Maintenance follows the site agreement.

⚠️

Won't work in our climate/conditions

Response:

The unit can run from its solar array. The site still needs an assessment for access, flooding, and local rules.

Evidence:

The public installation to visit is Lumbini Park, Hyderabad.

⚠️

Users won't accept new technology

Response:

The public-facing cabin is a staffed toilet. Cleanliness depends on how the site is run.

Evidence:

Cleanliness depends on how the site is run.

Technology Comparison Matrix

How circular toilet stacks up against alternatives

Criteriacircular toilet (ReFlow)Traditional SeweredBio-ToiletsOther NSS Systems
Capital Cost (per unit)₹15-20 lakhs₹8-12 lakhs + sewage pipeline (₹50L-1Cr/km)₹3-5 lakhs₹10-15 lakhs
Operating Cost (annual)₹1.2-1.5 lakhs₹4-6 lakhs (water + sewage treatment)₹2-3 lakhs (water + bacteria)₹3-5 lakhs
Water ConsumptionZero external water needed15-20,000 L/day8-10,000 L/day5-8,000 L/day
Sewage InfrastructureNot requiredMandatory (₹50L-1Cr/km)Required for liquid dischargeOften required
Environmental ComplianceDesigned not to discharge effluentRequires STP, discharge normsPartial (liquid discharge)Varies
CRZ SuitabilityAssess the site against local coastal rulesNot allowed in many CRZ areasConditional approvalGenerally not suitable
Maintenance FrequencyQuarterly service, IoT monitoringDaily cleaning + sewage line maintenanceWeekly bacteria dosing + cleaningBi-weekly to monthly
Uptime ReliabilityDepends on the installation and service85-90% (pipe blockages)80-85% (bacteria failures)85-90%
ScalabilityModular, any locationLimited by sewage networkLimited by discharge capacitySite-dependent
Smart FeaturesFull IoT, real-time monitoringLimited to noneNoneLimited

Detailed Case Studies

The public unit you can visit

Lumbini Park

Hyderabad

1Units
Deployment: Public park beside the Telangana Secretariat
Cost Savings
Quoted per site
Water Saved
Treated on site
Uptime
Not published
Key Outcome: Containerized toilet with on-site treatment. Designed not to discharge effluent.

What a district can check

Site
Assessment before installation
On site
Treatment inside the container
Rules
Local discharge requirements
Service
Operator logs and maintenance

Ready to Transform Your District's Sanitation Infrastructure?

The public unit is at Lumbini Park, Hyderabad, inaugurated in September 2026. Talk to us about a site in your district.

Or call us directly: +91-9494330442

Email: ved@loocafe.com