Turnkey Sanitation Bundles
Complete infrastructure packages designed for rapid deployment and immediate impact.
ReFlow Mini Bundle
Rapid Urban Deployment Kit

Best For:
- Urban streets & sidewalks
- High pedestrian traffic areas
- Bus stops & transit hubs
- Parks & recreational areas
- Rapid deployment needs
ReFlow Standard Bundle
Complete Community Solution

Best For:
- Tourist locations & attractions
- District parks & gardens
- Educational institutions
- Event venues
- Municipal facilities
40ft B-CRT Hub
District Sanitation Center - Gates Foundation Award Winner

Best For:
- Smart city infrastructure
- Airport & transit terminals
- Government facilities
- Commercial complexes
- District-scale deployments
Detailed Comparison
| Feature | ReFlow Mini | ReFlow Standard | 40ft B-CRT |
|---|---|---|---|
| Footprint | 64 sq ft | 150 sq ft | 320 sq ft |
| Capacity | 2 cubicles | 3 cubicles | 6+ cubicles + urinals |
| Daily Users | 500-1,000 | 1,000-2,000 | 3,000+ |
| Deployment Time | 2-3 days | 1-2 weeks | 1-3 months |
| Treatment Level | Basic | Intermediate | ISO30500 Advanced |
| Power Source | Solar/Grid hybrid | Solar primary | 100% Solar |
| IoT Technology | Standard | Advanced | AI-powered (Gemini 2.5) |
| Customization | Limited | Full | Full + Tech Integration |
| Cost Range | โน (Most affordable) | โนโน (Mid-range) | โนโนโน (Premium) |
| Ideal For | Urban rapid deployment | Parks & tourist areas | Government & smart cities |
Cost Comparison: ReFlow vs Traditional Infrastructure
Traditional sanitation infrastructure comes with hidden costs that municipalities bear for decades. ReFlow eliminates these through intelligent design and operational efficiency.
๐๏ธTraditional Public Toilets
Initial Costs
Annual Operating Costs
Hidden Costs
- Environmental damage (sewage leakage)
- Health hazards from poor maintenance
- Frequent breakdowns (no monitoring)
- Manual oversight inefficiency
- No revenue generation potential
๐ฟReFlow Toilets
Initial Costs
*Varies by model: Mini (โน12L), Standard (โน22L), B-CRT (โน35L)
Annual Operating Costs
Value-Add Benefits
- โ Revenue from advertisements (โน50k-2L/year)
- โ Water recycling value (saves โน2.2L/year)
- โ Zero environmental impact
- โ Real-time IoT monitoring (99.9% uptime)
- โ Scalable across entire district
The Math is Clear
40-60% Lower TCO
Save โน50 lakhs - โน1.18 crores per unit over 5 years
82% Lower Operations
Annual costs drop from โน15.5L to โน2.8L through automation
Zero Environmental Cost
No sewage discharge, 100% solar, water recycling
Revenue Generation
Offset 15-50% of operating costs through ads & recycling
Calculate Savings for Your District
Our team can provide a customized ROI analysis based on your specific requirements and scale
Get Custom ROI AnalysisISO30500 Procurement Guidance for Government Bodies
India's Liquid Waste Management Rules 2024 mandate ISO30500-compliant systems for non-sewered sanitation. Here's your complete guide to procuring ReFlow units within government frameworks.
Procurement Process (4-8 weeks)
Needs Assessment & Site Survey
Duration: 1-2 weeks
- Identify deployment locations (footfall analysis)
- Assess accessibility requirements
- Determine model selection (Mini/Standard/B-CRT)
- Calculate district-wide unit requirements
ReFlow Support: Free site assessment and deployment planning
Budget Approval & Tender Preparation
Duration: 2-3 weeks
- Prepare technical specifications (ISO30500 compliance mandatory)
- Include BoT model terms (if applicable)
- Reference Government Gazette: CG DL-E-08102024-257748
- Align with Liquid Waste Management Rules 2024
- Secure departmental budget allocation
ReFlow Support: Pre-qualified vendor documentation and compliance certificates
Vendor Selection & Contracting
Duration: 1-2 weeks
- Issue tender/RFP with ISO30500 requirement
- Evaluate vendors on compliance + experience
- Verify 270+ existing installations (Hyderabad proof)
- Award contract (Outright purchase or BoT)
ReFlow Status: Pre-qualified vendor for 50+ government locations
Deployment & Handover
Duration: Variable (2 days - 3 months)
- Mini: 2-3 days per unit
- Standard: 1-2 weeks per unit
- B-CRT: 1-3 months (Q4 2026)
- Training for municipal staff
- IoT platform access & dashboard setup
BoT Option: We operate for agreed period, then transfer with trained staff
Key Procurement Requirements
๐ Technical Specifications
- ISO30500 Compliance: Water quality certification (mandatory)
- Zero Discharge: No sewage connection required
- Solar Powered: 100% off-grid capability
- IoT Monitoring: Real-time tracking & AI alerts
- Modular Design: Relocatable & scalable
๐ Compliance Documentation
- Gazette Approval: CG DL-E-08102024-257748
- LWM Rules 2024: Compliance certificate
- Gates Foundation: Technology partnership proof
- Existing Deployments: 270+ location references
- Quality Certifications: ISO30500 test reports
๐ฐ Financial Terms
- Payment Options: Outright purchase or BoT leasing
- BoT Terms: 3-5 year operation periods
- Warranty: 5-year structural, 2-year electrical
- AMC Available: Annual maintenance contracts
- Funding Support: AMRUT, Smart City schemes eligible
๐ Vendor Credentials
- Experience: 270+ units operational in Hyderabad
- Capacity: 50M+ uses served
- Technology: Gates Foundation-backed innovation
- Scalability: District-wide deployment proven
- Support: 24/7 IoT monitoring + on-ground team
Eligible Government Funding Schemes
AMRUT 2.0
Atal Mission for Rejuvenation and Urban Transformation - covers sanitation infrastructure for ULBs
Smart Cities Mission
Smart city proposals can include IoT-enabled public sanitation under urban infrastructure
Swachh Bharat Mission-U 2.0
Focus on ODF++ and ODF+++ cities - ISO30500 compliant systems eligible
Jal Jeevan Mission (Urban)
Water recycling and conservation components qualify under circular water economy
Need Help with Procurement?
Our government relations team can assist with tender preparation, compliance documentation, and funding scheme alignment
Schedule Procurement ConsultationBuild-Operate-Transfer (BoT) Model
All ReFlow units can be deployed on a Build-Operate-Transfer basis, de-risking deployment for government agencies and ensuring operational excellence from day one.
Build
We construct and install the complete unit with all infrastructure
Operate
We manage operations for agreed period with trained staff
Transfer
Full ownership transfers to municipality with training completed
Not Sure Which Model is Right for Your District?
Schedule a consultation with our infrastructure planning team
Schedule Infrastructure Consultation